Dwarka, a holy city revered by Hindus, is believed to be the ancient kingdom of Lord Krishna. The Signature Bridge, connecting Okha to Beyt Dwarka Island, serves as a magnificent gateway to this sacred land, offering travelers a breathtaking experience.
Spanning a length of 2,260 meters, the Signature Bridge is a marvel of modern engineering. Its unique cable-stayed design, featuring two towering pylons, provides both strength and aesthetic appeal. The bridge's curved shape resembles a harp, earning it the nickname "Veena Bridge."
The bridge serves as a symbol of unity between the mainland and the island, making it easier for pilgrims and tourists to access Dwarka. It also plays a vital role in boosting the local economy by facilitating trade and tourism.
The Signature Bridge offers panoramic views of the Arabian Sea and the surrounding coastline. As you cross the bridge, you can witness the beauty of the blue waters teeming with marine life below. The bridge also provides a stunning backdrop for photographers and nature enthusiasts.
Dwarka is a popular pilgrimage destination for Hindus, and the Signature Bridge plays a crucial role in making the journey more accessible. It connects the mainland to Beyt Dwarka, where the famous Dwarkadhish Temple is situated. Pilgrims can now reach the holy site with ease and reverence.
The bridge has stimulated economic growth in the region by improving connectivity. It has eased the transportation of goods and services, boosting trade and commerce. The bridge has also enhanced tourism, as it has made it more convenient for visitors to reach the island.
The Signature Bridge was designed with environmental sustainability in mind. The construction materials and techniques minimize the impact on the surrounding ecosystem. The bridge also provides a dedicated lane for non-motorized traffic, promoting active lifestyles and reducing air pollution.
The construction of the Signature Bridge commenced in 2011 and was completed in 2017. The project cost approximately Rs 1,200 crores. It was a collaborative effort between the Gujarat government and the Government of India.
The Signature Bridge has received numerous awards and accolades for its innovative design and engineering excellence. In 2018, it was recognized as the "Cable-Stayed Bridge of the Year" at the prestigious FIDIC Global Infrastructure Awards.
During the construction of the bridge, a massive crane used to lift the heavy cables encountered a malfunction and crashed into the sea. Fortunately, the crew was safely evacuated, but the crane was lost. The incident served as a reminder of the immense challenges involved in such large-scale engineering projects.
To minimize the impact on marine life during construction, a team of engineers invented a unique solution. They used a series of underwater curtains to create a temporary barrier, diverting fish away from the worksite. The technique proved to be highly effective in protecting the local ecosystem.
As the bridge neared completion, a large flock of birds descended on the pylons and perched there for several days. The sight was interpreted as a divine blessing on the project, and it brought joy and optimism to the workers and the local community.
Feature | Value |
---|---|
Length | 2,260 meters |
Width | 24.7 meters |
Height | 87 meters |
Clearance above sea level | 33 meters |
Number of lanes | 4 |
Category | Value |
---|---|
Construction materials | Concrete, steel, and cables |
Workforce | 1,000+ |
Construction period | 6 years |
Category | Value |
---|---|
Average daily traffic | 10,000 vehicles |
Number of pedestrian crossings per day | 500+ |
2024-08-01 02:38:21 UTC
2024-08-08 02:55:35 UTC
2024-08-07 02:55:36 UTC
2024-08-25 14:01:07 UTC
2024-08-25 14:01:51 UTC
2024-08-15 08:10:25 UTC
2024-08-12 08:10:05 UTC
2024-08-13 08:10:18 UTC
2024-08-01 02:37:48 UTC
2024-08-05 03:39:51 UTC
2024-08-02 10:15:29 UTC
2024-08-02 10:15:43 UTC
2024-08-03 04:05:35 UTC
2024-08-03 04:05:47 UTC
2024-08-03 21:52:41 UTC
2024-08-04 17:10:36 UTC
2024-08-04 17:10:45 UTC
2024-10-20 01:33:06 UTC
2024-10-20 01:33:05 UTC
2024-10-20 01:33:04 UTC
2024-10-20 01:33:02 UTC
2024-10-20 01:32:58 UTC
2024-10-20 01:32:58 UTC